Grimes Infrastructure Project Expected to Last Most of Summer

Photo: Getty Images

(Grimes, Iowa) -- The city of Grimes is continuing to grow, and with that comes necessary upgrades to its infrastructure.

The city says crews will be installing a new water main on SE Trail Ridge from SE 6th to SE 2nd St, a project that's expected to take most of the summer to finish. The city says the current water main is too small for the growing number of residents using it.

Updates during the project will be posted online.


Sponsored Content

Sponsored Content